Very heavy goods: Mega-transportation project for offshore wind power
DB Schenker transported Menck's 170 metric tonne industrial weight by train, truck, and barge – first to Saarland for processing and then to Rotterdam's port. In Rotterdam, it was transferred to a construction ship for the last leg by sea. The weight was built into a hydraulic hammer that rams the foundations of offshore wind turbines into the bed of the North Sea.